This Civil engineering project was carried out over a 4 month period between January and April 2011. A sympathetic design was established to enable planning approval in a sensitive green belt area, and was to include landscaping and tree planting as part of the scope of works. A mixture of hard and soft landscaping enabled us to provide adequate emergency vehicle access, and good disabled access, along with a softer more natural feel to the rest of the overflow car park area. A large amount of surface water and land drainage was installed to ensure the heavy clay rich soil did not revert back to the boggy area it has become.

In addition we also provided a controlled one way system, with a barrier access control. A CCTV and lighting package added to a safe and secure environment for the staff using the facility.

Project Title
Worksmart Parking Initiative
Start Date
January 2011
Client SEPT
Completion April 2011
Architect/Agent Huggins, Bromage, Ferguson LLP
Value £156,000
Contract Manager
Philip Pearson
Reference
B5392
Smashed their SMSTS
Congratulations to Martin and Ollie who smashed their two-day SMSTS online course yesterday!SMSTS: The Site Management Safety Training Scheme covers· The Health and Safety at Work Act· Construction Design and Management (CDM) Regulations· Risk assessments/method statements· Recent changes in accepted working practices· Behavioural safety· Management of occupational health· Electricity· Excavations· Working at height· Scaffolding· Demolition· Confined spaces.Well Done lads!#loveconstruction#ccs...
JUST BE THERE!
JUST BE THERE…Today is World Mental Health Day so why should H W Wilson promote this on its social media channels?Well…Mental health has become the biggest risk to life in the UK construction sector where the demands of today’s construction industry have taken their toll on the health and wellbeing of its workforce and mounting stressors have resulted in some dark statistics...